Cohocton Wind Watch is a community citizen organization dedicated to preserve the public safety, property values, economic viability, environmental integrity and quality of life in Cohocton, NY and in surrounding townships. Neighbors committed to public service in order to achieve a reasonable vision for a Finger Lakes region worthy of future generations.


READ about the FIRST WIND Connection to the Obama Administration

Industrial Wind and the Wall Street Cap and Trade Fraud




********************************************************************

Wednesday, October 19, 2011

Lowell wind project fight continues in court and in woods

The highly disputed Lowell Wind Project is now under way.

Green Mountain Power began blasting near where protestors have camped out. Roughly 20 protestors camped out Tuesday on the mountain. The hike takes roughly one hour straight up from behind the Nelson's property.

The protestors are fighting Green Mountain Power's $156 million project planned to build 21 wind turbines-- each more than 400-feet tall. GMP officials say the turbines would power more than 24,000 homes.

The problem is a boundary dispute between GMP and Don and Shirley Nelson. They are unwilling to sell their property that is needed by GMP to blast on.

GMP says the project was supported by 75 percent of Lowell residents.

Protestors claim the town stands behind the Nelsons.

"We will build this wind project. We will most definitely build the wind project. What the issue is now is about safety. We need to clear a zone so that we can blast safely according to normal blasting procedures that are used hundreds of times a year across the state," said Dotty Schnure of GMP.

"Nobody is up there because they are required to be or even asked to be. So individuals are up there based on what they want to do. My folks have never posted their property against hunters and hikers," said Michael Nelson, the landowners' son.

Several protestors we met Tuesday declined to speak on camera and did want their names revealed due to the legal issue at hand. Don Nelson says there is no asking price or compromise aside from shutting the project down. He expects this will likely end in a lawsuit.

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home


Click on link to submit your SEC complaint on the
First Wind Holdings Inc. IPO public offering


TEN Reasons
Why the SEC should not allow First Wind to be listed on NASDAQ

First Wind Holdings Inc. 12/22/09 SEC S1/A IPO Filing

First Wind Holdings Inc. 7/31/08 SEC S1 IPO Filing

May 14, 2010 addition to the First Wind Holdings Inc. SEC S1A IPO Filing

August 18, 2010 amendment 7 to the First Wind Holdings Inc. SEC S1A IPO Filing

October 13, 2010 Filing update to the First Wind Holdings Inc. SEC S1A IPO Filing

New October 25, 2010 Filing update to the First Wind Holdings Inc. SEC S1A IPO Filing


FIRST WIND Lays an Egg WITHDRAWS IPO
after Wall Street no confidence in company




Send email request to join - RIWT Facebook Groupsplus
cohoctonwindwatch@gmail.com

RIWT is open to the public

Risks of Industrial Wind Turbines is a group of citizens and organizations dedicated to preserve the public safety, property values, economic viability, environmental integrity and quality of life of residents and future generations.

**************